New Housing Developments

Overview


Rosemount continues to expand it's housing choices through private development.  A summary of each project is provided below.  If you have questions about any of these projects, please contact the Engineering Department at (651) 322-2022. 

Bella Vista 6th Addition
This is the second-to-last phase of the Bella Vista development north of Bonaire Path and East of Bacardi Avenue.  This phase is a cul-de-sac with 19 single-family homes by the developer Lennar.

Dunmore and Dunmore 2nd

Copper Creek Development is currently constructing the first two phases of Dunmore, located on the west side of Highway 3 just south of 132nd Street. There are 55 single-family lots in these first two phases. The remaining 32 homes will be developed in a future phase along with a pocket park, and will include a trail to connect to Lebanon Hills Regional Park to the north and south to Downtown Rosemount. Dunmore has two builders – Paragon Homes and Distinctive Design Build

Greystone 7th and 8th Additions 
These are the final phases of the Greystone development on the east side of Akron Avenue between Bonaire Path and CSAH 42.  Both phases together include 71 homes by CalAtlantic Homes (Lennar).


Harmony Villas and Harmony Villas 2nd
This development is on the north side of Connemara Trail, just east of TH3 in the Harmony development.  It will be completed in two phases, with 16 town homes in the first phase and 26 town homes in the second phase.  The developer is Mark Elliot Homes.

Meadow Ridge and Meadow Ridge 2nd
These developments are on the west side of Akron Avenue, north of Bonaire Path.  The first addition includes 34 single-family homes and the 2nd addition includes 29 single-family homes, all by developer Lennar.  Construction began on the first addition in summer, 2018 and will continue with the 2nd addition in spring 2019.  A third phase is anticipated in 2020.

Prestwick Place 17th - 22nd Additions
This is the continuation of the Prestwick development along Akron Avenue, north of Connemara Trail.  Multiple neighborhoods are under construction with single-family (west of Akron) and multi-family (east of Akron) projects that began in 2019 and will continue through 2020.

Rosewood Crossings
This is an apartment complex on the south side of 145th Street, just east of the railroad tracks.  The first phase will include two buildings, each with 32 units.  The developer is KJ Walk, Inc.  Construction will continue through the 2019 construction season.  More buildings are anticipated with future phases.


close carousel