Fees

Building Permits and Fees [View current fee resolution.]





Certificate of Occupancy Inspection and/or change of use $58.00

Building Permits


As recommended by Value Range – Exhibit A
As-built Survey Escrow Fee $2000.00

Plumbing, Heating, Ventilating, Air conditioning & Refrigeration


Residential (4 or less units)
New Construction $125.00 + $1.00 surcharge = $126.00
Alteration/repair $70.00 + $1.00 surcharge = $71.00

Multiple Housing (5 or more units)
New Construction $100.00/unit + $1.00 surcharge per permit.
Example: 5 units $500.00 + $1.00 surcharge = $501.00
Alteration/repair $70.00/unit + $1.00 surcharge per permit.
Example: 5 units $350.00 + $1.00 surcharge = $351.00

Commercial/Industrial/Institutional New Construction
1.5% of valuation plus $.0005 valuation surcharge
$215.00 minimum fee plus $.0005 valuation surcharge

Commercial/Industrial/Institutional/Public
Set fee of $75.00 for project valued under $3,500.00 which requires one
inspection. $75.00 + $1.00 surcharge = $76.00
Set fee of $125.00 for project valued under $3,500.00 which requires two
inspections. $125.00 + $1.00 surcharge = $126.00
For projects valued over $3,500.00, 1.5% of the value of the project, with a
minimum fee of $215.00 Plus $.0005 valuation surcharge.
Minimum fee of $215.00 Plus $.0005 valuation surcharge.

Sewer and Water Installation Permit Fees


Municipal Service – residential (4 or less units) $55.00 + $1.00 surcharge = $56.00

Municipal Service – commercial/industrial/institutional 1.5% of valuation plus $.0005 valuation surcharge. $105.00 minimum fee plus $.0005 valuation Surcharge

Private Sewer – all classifications
New construction or reconstruction $250.00
Dakota County Recording Fee $50.00
Surcharge $1.00
Total $301.00

Decks

$100.00 + $1.00 surcharge = $101.00

Demolition Permit $100.00 + $1.00 surcharge = $101.00

Dumpster Enclosure $60.00 + $1.00 surcharge = $61.00

Fences $75.00 no surcharge

Fireplaces $100.00 + $1.00 surcharge = $101.00

Manufactured Homes
Inclusive of all inspections and connections $100.00 + $1.00 surcharge = $101.00

Moving Permit


Moving Permit – Out $180.00 + $1.00 surcharge = $181.00
Moving Permit – In $175.00 + $1.00 surcharge = $176.00

Penalty for failing to obtain a permit prior to starting work requiring a permit


2 times the regular permit fee as established herein

Re-inspection

$50.00 no surcharge

Roofing, Re-Roofing – Residential $75.00 + $1.00 surcharge = $76.00

Residential –Tear off, Re-roof, and Overlay Commercial/Institutional/Industrial - As recommended by Exhibit A Plus $.0005 valuation surcharge. Minimum fee of $100.00 +$.0005 valuation surcharge

Siding – Residential


Re-siding $75.00 + $1.00 surcharge = $76.00
Commercial/Institutional/Industrial: As recommended by Exhibit A
-plus $.0005 valuation surcharge. Minimum fee $84.00 plus $.0005
valuation surcharge.

Satellite Dishes and Antennas

– Residential

No fee

All other antennas and satellite dishes

Per Building Value Range Plus $.0005 valuation surcharge. Minimum fee $84.00 plus $.0005 valuation surcharge

Single Family Dwelling Basement Finish

$175.00 + $1.00 surcharge = $176.00

Patios


Residential Slab $50.00 no surcharge
Residential/Multi-Family Slabs/Patios $70.00 no surcharge
Commercial/Institutional/Industrial $70.00 no surcharge

Special and Miscellaneous Inspections

$75.00


Swimming Pools $150.00 + $1.00 surcharge = $151.00

Temporary Construction Trailer $65.00 + $1.00 surcharge = $66.00

Water Softener Installation $70.00 + $1.00 surcharge = $71.00

Window Replacement $46.00 + $1.00 surcharge = $47.00